07 · CONSTRUCTION METHODS

Modular, panelized or site-built?

Compare where the work happens, what arrives on the lot and who finishes the job.

Click Modular · Partner home example
Click Modular · Partner home example

Three ways to organize the construction

Most of the building is completed in a factory.

What arrives

Large building sections, often with substantial interior work complete. Confirm the specific supply scope.

What still happens on site

Foundation, services, placement, connections and the remaining site and finishing work.

Questions to ask early

Can the modules reach the property? Where can the crane set up? What loads, connections and tolerances does the manufacturer require?

What controls the schedule

Manufacturing capacity, design approval, permits, site readiness and delivery coordination.

Compare methods using the same design and complete scope. Every option still needs suitable access, foundations, services and permits.

Check the delivery plan before ordering

Crane placing a home module above another section at a wooded site
Hewing Haus · Modular installation example.

Have the delivery team check the route before ordering a modular home:

  • Overhead wires, turning room and road restrictions.
  • Crane reach, setup space and ground capacity.
  • Who handles route approvals and any extra work.
What about panelized and site-built access?

Panelized work needs lifting, storage, weather protection, temporary bracing and an assembly crew. Site-built work needs room for repeated deliveries, storage and trades throughout construction.

Put the factory and site responsibilities in writing

Building supplier

Confirm drawings, loads, support points, connections, completion level, inspections and warranty.

Site team

Confirm foundations, services, installation preparation, connections, stairs and outdoor completion.

Who manages the handover and schedule?

Name who handles delivery, installation and coordination. Agree what happens if the foundation or delivery date changes. Include design, permits, production, site work and final approval in the schedule.

Explore the full building process
Check your quote for gaps

CHECK THE SOURCE

Sources for this guide

Province · BC Building Code 2024 and revisionsProvince · Current BC Code bulletinsNewlinesADU · Pre-construction planningNewlinesADU · Public Valleycliffe case studyNewlines Contracting · Public custom-home portfolio

Last updated October 3, 2026. Requirements can change and depend on your property. Use these sources with your designer and the District to confirm the surveys, advice and approvals needed. Concept drawings simplify construction details.

KEEP EXPLORING

Explore the drawings and material choices that come next.

Understand the drawings. Choose the details.

ASK ABOUT YOUR LOT

Have a property in mind?

Share your address and ideas. We can help you work through the next steps.

Get a free lot assessment